Before initiating optimization, specifications must be entered for key equipment models such as boilers, turbines, HRSGs, and gas turbines.
These parameters—including startup costs, fuel details, and efficiency coefficients—determine equipment costs and, in turn, drive network optimization. Because cost governs the direction of optimization, accurate input is essential to the precision of ENetOPT's results.